Tel. +34 964 28 02 40

(only in spanish version) – Artículo revista ROP Septiembre 2019

READ MORE Artículo JV Rajadell para Rúbrica_ MonograficoTuneles 2019_septiembre_3612_Página_1 READ MORE Artículo JV Rajadell para Rúbrica_ MonograficoTuneles 2019_septiembre_3612_Página_2 READ MORE Artículo JV Rajadell para Rúbrica_ MonograficoTuneles...

Report RÚBRICA TUNNELS 2018

Rúbrica Ingeniería, thanks to its division RÚBRICA TUNNELS, and through its subsidiary in Colombia RÚBSTER, consolidates the growth in that country, positioning itself as the reference brand in engineering solutions for tunneling equipment. Among the main civil works...

Construction of the Mulatos tunnel formwork (Colombia)

Construction of the Mulatos tunnel in the Pacífico 2 connection highway concession in Colombia. The equipment is composed of one formwork and one traveller of radius 6.40 / 4.66 m, and advance 15m divisible into two independent formworks of 9 m and 6 m. It is supplied...

RÚBRICA TUNNELS 2017: international consolidation

RÚBRICA TUNNELS: International Consolidation RÚBRICA TUNNELS is the technical division of Rúbrica Engineering for the development of formwork equipment for bored tunnels. In 2017 we consolidated our presence in highly competitive international markets, and with a...

New tunnel in Hong Kong

Rubrica engineering has designed and manufactured a formwork for the construction of a curved slab inside the Princess Hill Tunnel in Hong Kong. The formwork panels have dimensions of 13.00 mts x 12.00 mts and a variable height of 6.00 mts to 7.30 mts. (approx.) The...