Carros de encofrado especiales para el Puente de Mersey

 



Carros de encofrado especiales para el Puente de Mersey

Cliente: Merseylink
País: UK
Ubicación: Halton, North West England
año: 2015 to 2017

Descripción:

6 no. R-1900 series form travellers and 2 no. Wing Travellers for the approaches for the construction of a cable stay bridge

NECESIDADES IDENTIFICADAS:

Automatized operation either for external and for internal form, avoiding the vertical movement and stripping using deformation of the structure. Internal form floating system, with a capacity of withstand 300 tons of concrete. The cable was needed to be anchored prior launching, being a real challenge to develop a inner form capable to enable the PT of the stay cable after pouring.

¿CUÁL FUE EL RETO ?:

Avoid the use of sacffold, avoid the lowering of FT on each movement and internal form adaptability to the different cross sections.

Carros de encofrado especiales para el Puente de Mersey

Cliente: Merseylink
País: UK
Ubicación: Halton, North West England
año: 2015 to 2017

Descripción:

6 no. R-1900 series form travellers and 2 no. Wing Travellers for the approaches for the construction of a cable stay bridge

NECESIDADES IDENTIFICADAS:

Automatized operation either for external and for internal form, avoiding the vertical movement and stripping using deformation of the structure. Internal form floating system, with a capacity of withstand 300 tons of concrete. The cable was needed to be anchored prior launching, being a real challenge to develop a inner form capable to enable the PT of the stay cable after pouring.

¿CUÁL FUE EL RETO ?:

Avoid the use of sacffold, avoid the lowering of FT on each movement and internal form adaptability to the different cross sections.