STATUS ATLANTIC BRIDGE PANAMÁ

STATUS ATLANTIC BRIDGE PANAMÁ

Form traveller first lifting has been completed in the Panama Atlantic Bridge. Hoisting structure assembled on pier table P23 and frontal part of form traveller 3 lifted.