Tel. +34 964 28 02 40

FORMWORK FOR UNDERWATER CONCRETE, ISLAND OF FOGO, CAPE VERDE

  Rubrica Maritime

Customer: CPTP

CAPE VERDE

Location: Island of Fogo
Year: 2011
Description:

Self-contained equipment with hydraulic opening/closing system, active floating, passing rod load reduction system and hydraulic system for concreting.