Tel. +34 964 28 02 40

FORMWORK FOR UNDERWATER CONCRETE ISLAND OF FOGO, CAPE VERDE

  Rubrica Maritime

CAPE VERDE

Location:
Island of Fogo
Year: 2011
Customer:
CPTP
Description:

Self-contained equipment with hydraulic opening/closing system, active floating, passing rod load reduction system and hydraulic system for concreting.