NEWS .

Status Atlantic Bridge Panamá

Status Atlantic Bridge Panamá .
20 April 2017
rubrica

Form traveller first lifting has been completed in the Panama Atlantic Bridge. Hoisting structure assembled on pier table P23 and frontal part of form traveller 3 lifted.